Warren Farm

Warren Farm:

Road: M25 between J16 and J17
Location: Gerrards Cross, Chalfont St Peter, Buckinghamshire
Other names: Chalfont St Peter
Developer: Extra
Grid reference: TQ018900 (SABRE Maps)

Google Maps link


Camera icon
No photos tagged with Warren Farm services. If you have one, why not upload it?

Warren Farm is a new service area being proposed by Extra. It will be built on the M25 near J16 and J17, near Chalfont St Peter.

Facilities are to be provided to the west of the motorway, with a tied arch bridge and new looped junction providing access to both sides. The amenity building would be shaped like a giant leaf, with a grass roof except for another leaf-shaped glass section, all attached to the hotel by a glazed entrance. At the back would be a walk around a lake, feeding into a stream which would run down the middle of the car park.

Inside the building would have 12 units spread out around a central seating area, with toilets at the back. Two of those units would have a mezzanine area, with a business centre and offices joining them on the first floor. The hotel would have a dedicated restaurant area. As is common with Extra services, no brands have been named, as it would depend on what interest is received - but you can expect the interest to be similar to what's at Leeds Skelton Lake.

The petrol station would have 36 car pumps and would also have a grass roof, as would the hotel. A large HGV parking area has been designated. A number of variations of the masterplan were published, experimenting with different building positions and road layouts.

Chiltern District Council are currently considering the plan. Local action group SENSE4CSP have outlined a number of objections, stating that there is no proven need for the development, and that its location is unsuitable. One complainant told the local newspaper that although she realised there were no plans to connect the service area to the local road network, she worried this would happen anyway and that it would create congestion.

Thames Valley Police have raised a more credible objection, explaining that the nearby service area at Beaconsfield creates a lot of work for them, and that they would expect this proposal to be similar. The problems at Beaconsfield appear to be exacerbated by the clientele the choice of brands attracts, and the easy access to an urban area.

In justifying the scheme, Extra have stated that there is a "significant public safety need" to address driver tiredness. Buckinghamshire County Council have agreed that the region does not have enough HGV parking spaces.

History

Full details: M25 Planning Applications

This land was the subject of a service area planned between 1996 and 1999, by Total. This would have had facilities on both sides of the road. The plan was rejected at the 1999 public inquiry and Cobham was eventually built instead, but that is at full capacity.

In August 2017, Highways England started building a new exit on the M25 south of J17, which is to allow construction vehicles direct access to the High Speed 2 railway construction site. They claim the sliproads (which are very well-aligned) will only have 10 years service. In October 2018, Extra announced that they wanted to use this site in future to build a large service station, which would be very similar to Cobham.

Extra's plan (which they call Warren Farm) would not actually re-use the existing sliproads, but build a new trumpet-style interchange with a large loop.

Publicity for the Extra plan was released in October 2018, with local consultations held in January 2019, and an outline planning application submitted in July 2019.

Visitor Feedback


Views expressed in these comments are those of the individual contributor. User accounts are managed by Facebook.
We ask the companies named to check here regularly but can't guarentee they will do so.